• @xantoxis
    link
    91 month ago

    All I can think is it has to be a massive pain in the ass to do maintenance. You’d have to shut down the whole park and remove a bunch of unrelated slides to fix anything on one ride.

    • @[email protected]
      link
      fedilink
      English
      21 month ago

      When The Boiler breaks

      So you have to shut down The Fractionator, Extruder, Cracker, and Vaporizer