• @[email protected]
    link
    fedilink
    English
    301 year ago

    Not quite circular, they only got 26% of the tunnel dug. Still, 23 km is quite a long tunnel to leave sitting empty

    • @[email protected]
      link
      fedilink
      English
      241 year ago

      Fill it with cheese. Make another cheese vault. We require the cheese. Government cheese. Cheese.

      • @Thrashy
        link
        English
        61 year ago

        Alas, I don’t think he will much care to build a subway-but-shitty between one farm outside Waxahachie, TX, to another farm outside of Waxahachie, TX. Not enough density of mouthbreathing Elon stans there.

    • @Yokozuna
      link
      English
      51 year ago

      Thanks for clearing that up, I thought I was finished or near completion. Glad they decided to stop production when they did but sucks that we didn’t get it.